17 NovSolar Installation – Installation Day Five

Tuesday, November 17 2009:

I think today will be the longest day that the installers worked. They started at 8am and left as 5:30pm (basically dark). They really wanted to get all of the panels mounted and finish up the roof work.

They were sucessful. I couldn’t take any decent pictures of the mounted panels since they didn’t finish until dark.

One interesting thing.. Did you know that you can stand on the panels? Ok, maybee not ME, but the installers did. I wish I had my camera at the time. I was blown away. 😉

Here are the install pics:

Removing cardboard from panels to lay onto rails

Removing cardboard from panels to lay onto rails

After placing the captured nuts in the rail, the installer aligns the panel into place and...

After placing the captured nuts in the rail, the installer aligns the panel into place and...

Screws the retainer aluminum blocks down to hold down the panel.

Screws the retainer aluminum blocks down to hold down the panel.

Wires from panels waiting to be daisy-chained together

Wires from panels waiting to be daisy-chained together

The aluminum penetrating roof mount. I was concerned this would leak, but after the LB install, it look fine.

The aluminum penetrating roof mount. I was concerned this would leak, but after the LB install, it looks fine.

The installers did a great job on the conduit install inside the garage. Tucked up high and out of the way.

The installers did a great job on the conduit install inside the garage. Tucked up high and out of the way.

The two wire feeds from the two solar banks junction here and goto the breaker panel.

The two wire feeds from the two solar banks junction here and goto the breaker panel.

Inverters wired up to breaker box

Inverters wired up to breaker box

Closeup of wired inverter with door open

Closeup of wired inverter with door open